1
|
SAUDI ELECTRICITY COMPANY, EASTERN REGION
|
MAINTENANCE OF FUEL STORAGE TANK NO.6 AT TABARJAL POWER PLANT SFC CONTRACT NO.4400008128
|
MOBILIZATION, TANK CLEANING, INSPECTION, REPAIR, BLASTING AND PAINTING FOR INTERNAL AND EXTERNAL OF FUEL STORAGE TANK NO.6 AT TABARJAL POWER PLANT.
|
03-08-2016 TO 03-01-2017
|
2
|
SAUDI ELECTRICITY COMPANY, EASTERN REGION
|
MAINTENANCE OF FUEL STORAGE TANK NOS. 4 & 5 AT TABARJAL POWER PLANT SFC CONTRACT NO.4400007610
|
MOBILIZATION, TANK CLEANING, INSPECTION, REPAIR, BLASTING AND PAINTING FOR INTERNAL AND EXTERNAL OF TWO FUEL STORAGE TANKS (TANK NO.4 & 5) AT TABARJAL POWER PLANT.
|
11-04-2016 TO 11-10-2016
|
3
|
SALINE WATER CONVERSION CORPORATION, KHOBAR
|
REHABILITATION OF TWO (2) HEAVY FUEL STORAGE TANKS LOCATED AT PUMP STATION OF SWCC AL-KHOBAR PLANT.
CONTRACT NO.KH/R/M/327
|
MOBILIZATION, PROCUREMENT OF STEEL PLATE, SLUDGE REMOVAL, TANK CLEANING,REMOVAL OF EXISTING BOTTOM PLATE, INSTALLATION OF NEW BOTTOM PLATE, INSPECTION, SANDBLASTING, PAINTING, HYDROTEST, EVALUATION OF EXSISTING CP SYSTEM CONDITION.
|
02-08-2015 To 02-02-2017
|
4
|
SAUDI ELECTRICITY COMPANY, EASTERN REGION
|
REPAIR OF QURAYYAH POWER PLANT FUEL OIL TANKS AT QURAYYA POWER PLANT, CONTRACT NO.4400004932
|
MOBILIZATION, TANK CLEANING, SAFE DISPOSAL OF CRUDE OIL TO THE APPROVED DUMPING AREA, INSPECTION , REPAIR, GRIT BLASTING AND PAINTING OF 6 TANKS (TANK NO.702 & 704 AND 4 NOS. OF SMALL TANKS) AT QURAYYAH P.P
|
17-11-2014 TO 28-02-2015
|
5
|
SALINE WATER CONVERSION CORPOSATION, JUBAIL
|
RWTS LINE AB LOW VOLTAGE CONTROL CABLE REHABILITATION AT HPT, CONTRACT NO.RW/R/I/311
|
MOBILIZATION, PROCUREMENT OF L.V CONTROL CABLE, EXCAVATION OF CONTROL CABLE TRENCH, INSTALLATION OF PVC PIPE DUCT, INSTALLATION OF CONCRETE MANHOLES, LAYDOWN NEW CABLES, DISCONNECT EXISTING CABLE S AND TERMINATION OF NEWLY INSTALLED CABLES, TEST & COMMISSIONING, BACKFILLING AND RESTORATION
|
06-08-2014 TO 05-02-2015
|
6
|
SAUDI ELECTRICITY COMPANY, CENTRAL REGION
|
REHABILITATION OF 39 NOS. OF CRUDE OIL STORAGE TANKS AT SEC CENTRAL AREA POWER PLANTS, CONTRACT NO.4400002648
|
MOBILIZATION, TANK CLEANING AND SAFE DISPOSAL OF CRUDE OIL TO SPECIFIED DUMPING AREA, TANK INSPECTION, DO THE NEEDFUL TANK REPAIR WORKS AS PER INSPECTION REPORT,SURFACE PREPARATION, BLASTING, JET CLEANING AND APPLICATION OF PROTECTIVE COATING MATERIALS.
|
06-11-2013 TO 05-11-2016
|
7
|
SAUDI ELECTRICITY COMPANY, CENTRAL REGION
|
REHABILITATION OF 61 NOS. OF DIESEL FUEL STORAGE TANKS AT SEC CENTRAL AREA POWER PLANTS, CONTRACT NO.4400002647
|
MOBILIZATION, TANK CLEANING AND SAFE DISPOSAL OF DIESEL TO SPECIFIED AREA, TANK INSPECTION, DO THE NEEDFUL TANK REPAIR WORKS AS PER INSPECTION REPORT,SURFACE PREPARATION, BLASTING, JET CLEANING AND APPLICATION OF PROTECTIVE COATING MATERIALS.
|
06-11-2013 TO 05-11-2016
|
8
|
ROYAL COMMISSION FOR JUBAIL & YANBU
|
REHABILITATION OF IRRIGATION WATERLINES, CONTRACT NO.531-C64
|
MOBILIZATION, PROCUREMENT OF UPVC PIPES AND FITTINGS, REMOVAL OF EXISTING IRRIGATION WATER LINES AND INSTALL NEW LINES INCLUDING SPRINKLER SYSTEM, UPVC RISERS ON ABOVE ROAD AND UNDER GROUND PAVEMENT NEAR ABOUT 140KM, TESTING AND COMMISSIONING
|
22-05-2013 TO 21-02-2015
|
9
|
SAUDI ELECTRICITY COMPANY (SEC-CO) RIYADH
|
SUPPLY OF SEASONAL SKILLED MANPOWER TO ASSIST IN OPERATION & MAINTENANCE ACTIVITIES AT SEC-COA POWER PLANTS CONTRACT NO.4400003094
|
SUPPLY OF SKILLED AND SEMI SKILLED TECHNICIANS TO ASSIST THE OPERATION AND MAINTENANCE TEAM FOR THE ROUTINE MAINTENANCE OF PLANT FACILITIES. THE MANPOWER WILL BE PROVIDED AS PER SECO SERVICE ORDER OR SITE REQUIREMENT
|
19-1-2014 TO 09-09-2015
|
10
|
SALINE WATER CONVERSION CORPORATION (SWCC), YAMBU
|
BOTTOM PLATE REPLACEMENT AND MAINTENANCE OF 2 (TWO) HEAVY FUEL STORAGE TANKS NO.A173-K-001 & 2) AT SWCC YANBU PLANT. CONTRACT NO.Y/T/G/0024
|
MOBILIZATION, PROCUREMENT OF STEEL PLATE, SLUDGE REMOVAL, TANK CLEANING,REMOVAL OF EXISTING BOTTOM PLATE, INSTALLATION OF NEW BOTTOM PLATE, INSPECTION, SANDBLASTING, PAINTING, HYDROTEST, EVALUATION OF EXSISTING CP SYSTEM CONDITION
|
30-09-2012 TO 29-03-2014
|
11
|
SALINE WATER CONVERSION CORPORATION (SWCC), JUBAIL
|
REPLACEMENT & UPGRADING OF 13.8KV UNDEGROUND HIGHVOLTAGE CABLE NETWORK IN HOUSING COMPOUND, SWCC JUBAIL CONTRACT NO.JB/R/E/0620
|
MOBILIZATION, PROCUREMENT OF HIGH VOLTAGE CABLES, EXCAVATION & BACKFILLING CABLE TRENCH, CABLE LAYING, INSTALLATION OF DUCT BANKS, INSTALLATION OF RMU, SPLICING & TERMINATION, TEST & COMMISSIONING, SITE RESTORATION AND DEMOBILIZATION
|
26-09-2012 TO 25-09-2013
|
12
|
SALINE WATER CONVERSION CORPORATION (SWCC), SHUQAIQ
|
TO SUPPLY OF NEW CABLE IN SPECIFIED SIZE TO LAY UNDERGROUND FROM PS1 TO NEW HOUSING COMPOUND, CONTRACT NO.SQ/R/E/11769
|
MOBILIZATION, PROCUREMENT OF CABLES, EXCAVATION OF CABLE TRENCH, CABLE LAYING, SPLICING/TERMINATION, TESTING AND COMMISSIONING, DEMOBILIZATION
|
25-03-2012 TO 24-11-2012
|
13
|
SALINE WATER CONVERSION CORPORATION (SWCC), JEDDAH
|
REHABILITATION OF BAR SCREEN AND TRAVELLING SCREEN AT PUMP HOUSE J-4, SWCC JEDDAH , CONTRACT NO.JD/R/M/428
|
MOBILIZATION, MATERIAL PROCUREMENT, REHABILITATION OF 8 BAR SCREEN AND 8 NOS. OF TRAVELLING SCREEN IN THE PUMP HOUSE AT J-4 PLANT AT SWCC JEDDAH
|
14-03-2012 TO 13-01-2014
|
14
|
SALINE WATER CONVERSION CORPORATION (SWCC), JUBAIL
|
REPLACEMENT OF C2F6, 19 N0S. OF DRY TYPE TRANSFORMERS IN PHASE-1, CONTRACT NO. JB/R/E/346
|
ENGINEERING, PROCUREMENT, REPLACEMENT OF 19 TRNASFORMERS, INSTALLATION OF NEW 19 TRANSFORMERS, CIVIL WORKS, TESTING & COMMISSIONING.
|
21-09-2011 TO 20-09-2014
|
15
|
KING FAHAD INDUSTRIAL PORT, JUBAIL
|
REPLACEMENT OF THE UNDERGROUND ASBESTOS WATER CEMENT LINES TO RTRP PIPE SYSTEM
|
PROCUREMENT, EXCAVATION AND REMOVAL OF EXISTING UNDERGROUND ASBESTOS WATER CEMENT PIPELINES, DISPOSAL OF ASBESTOS PIPES AND FITTINGS AT DUMPING AREA AS PER PME STANDARD, INSTALLATION OF NEW GRE/PIPES AND FITTINGS INSTEAD OF PREVIOUS ASBESTOS LINES
|
05-04-2011 TO 04-07-2013
|
16
|
SALINE WATER CONVERSION CORPORATION (SWCC), YANBU
|
FABRICATON AND INSTALLATION OF DESALINATION UNITS PRODUCT WATER PIPELINE AT PH.11 AT SWCC YANBU, CONTRACT NO. Y/M/D/0039
|
REMOVAL & DISPOSAL OF EXISTING PRODUCT WATER PIPELINE, PROCUREMENT OF RTR PIPE AND FITTINGS FABRICATION OF SPOOLS, ASSEMBLY, INSTALLATION, TESTING AND COMMISSIONING
|
22-02-2011 TO 15-04-2012
|
17
|
SALINE WATER CONVERSION CORPORATION (SWCC), JUBAIL
|
TO UPGRADE CONTROL PANEL OF PLANTS ROAD LIGHTING RR NO.11414
|
PROCUREMENT OF CONTROL PANEL, INSTALLATION, CABLE LAYING AND INSTALLATION OF ROAD LIGHTING AS PER SCOPE OF WORK
|
25-02-2012 TO 11-04-2012
|
18
|
SAUDI ELECTRICITY COMPANY (SECO) TABARJAL PLANT
|
CLEANING OF TWO WATER TANKS # 1 & 2 AT TABARJAL POWER PLANT. CONTRACT NO.32008/86
|
CLEANING, BLASTING, INSPECTION, REPAIR & PAINTING (INTERNAL & EXTERNAL) OF WATER TANKS NO.1 AND 2 AT TABARJAL PLANT
|
15-08-2011 TO 14-01-2011
|
19
|
SALINE WATER CONVERSION CORPORATION (SWCC), JUBAIL
|
TO REMOVE SAND, ANTHRACITE, GRAVEL AND NOZZLE FROM FOUR DUAL MEDIA FILTERS (DMF-A~P) AND REFIX ,REPAIR REQUEST NO.9163
|
REMOVAL SAND, ANTHRACITE GRAVEL AND NOZZLE, CLEAN DMF UPPER AND LOWER CHAMBER, REPLACE FASTENERS, PAINT BEAM AND ROOF SHEET WITH PRIMER, FILL SAND GRAVEL AND ANTHRACITE AFTER INSTALLATION OF NOZZLE.
|
22-06-2011 TO 21-02-2012
|
20
|
SALINE WATER CONVERSION CORPORATION SHUQAIQ (SWCC)
|
REPLACE DRINKING WATER TRANSMISSION LINE FROM MAIN PUMPING STATION NO. 1 TO HOUSING COMPOUND Contract No.SQ/MM/380
|
ENGINEERING & PROCUREMENT WORK, EXCAVATION & BACKFILLING WORK, CONCRETING OF TRUSS BLOCKS & PIPE SLEEPERS FDN., FABRICATION & INSTALLATION OF ABOVEGROUND/ UNDERGROUND GRP PIPES, HYDROSTATIC TEST OF GRP PIPE, TESTING & COMMISSIONING WORK
|
17-07-2010 TO 16-07-2011
|
21
|
SAUDI ELECTRIC COMPANY, (SECO) DAMMAM
|
CLEANING & REPAIR OF CRUDE OIL TANKS # 703 # 704 AT QURAYYAH POWER PLANT Contract No.31022009
|
SLUDGE REMOVAL & CLEANING OF TANKS, INSPECTION & NDT WORKS, TANK REPAIR WORKS, BLASTING & PAINTING WORKS
|
13-09-2010 TO 28-12-2010
|
22
|
SALINE WATER CONVERSION CORPORATION JUBAIL (SWCC)
|
UPGRADE/REPLACE THE OIL TYPE TRANSFORMER, SWITCHES & DISTRIBUTION PANELS AT LFO SYSTEM & PH.1 SECURITY BUILDING Contract No.RR#22397
|
UPGRADE/REPLACE THE OIL TYPE TRANSFORMER, SWITCHES & DISTRUBUTION PANELS
|
07-11-2009 TO 06-05-2010
|
23
|
SALINE WATER CONVERSION CORPORATION JUBAIL (SWCC)
|
FABRICATION & SUPPLY OF ALL FRP PIPES & FITTINGS NEEDED TO REPLACE THE EXISTING C.S. PIPES AT BLENDING STATION NO.3 Contract No.JB/R/M/564
|
ENGINEERING & PROCUREMENT WORK, REMOVAL OF EXISTING CS PIPES, EXCAVATION& BACKFILLING WORK, CONCRETING OF TRUSS BLOCKS & PIPE SLEEPER FDN FABRICATION & INSTALLATION OF FRP PIPES, HYDROTESTING WORK, TESTING & COMMISSIONING WORK.
|
17-11-2009 TO 16-08-2010
|
24
|
SALINE WATER CONVERSION CORPORATION JUBAIL (SWCC)
|
SUPPLY OF FRP PIPES AND FITTINGS NEEDED TO REPLACE THE EXISTING C.S PIPES AT PH1 ~ PH6 Contract No.JB/R/M/1184
|
ENGINEERING & ROCUREMENT WORK, REMOVALOF EXISTING CS PIPE , CONCRETING OF PIPE SLEEPERS FDN., FABRICATION & INSTALLATION OF FRP PIPES, HYDROTESTING , TESTING & COMMISSIONING
|
16-08-2009 TO 15-02-2011
|
25
|
SAUDI ELECTRIC COMPANY, (SECO) RIYADH
|
CLEANING AND REPAIRING OF FUEL TANKS IN POWER PLANTS Contract No.10722039/00
|
SLUDGE REMOVAL & CLEANING OF TANKS, MATERIAL PROCUREMENT, INSPECTION & NDT WORKS, REPAIR BY PATCH-UP WORK, REPLACE OF BOTTOM PLATE, REPLACE DAMAGED ROOF SEAL, BLASTING & PAINTING.
|
24-11-2007 TO 23-11-2012
|
26
|
SAUDI ELECTRIC COMPANY, (SECO) RIYADH
|
TECHNICAL MANPOWER SUPPLY FOR MAINTENANCE & OPERATION OF GENERATION PLANT AT SEC PLANT AT SEC 10822012/00
|
MANPOWER SUPPLY
|
23-03-2008 TO 22-03-2011
|
27
|
SALINE WATER CONVERSION CORPORATION JEDDAH (SWCC)
|
REHABILITATION OF BAR SCREEN AND TRAVELLING BAND SCREEN IN THE PUMP HOUSE AT JEDDAH Contract No.JD/R/M/366
|
REHABILITATION OF BAR SCREEN & TRAVELLING BAND SCREEN, BLASTING & PAINTING WORK.
|
09-02-2008 TO 08-05-2009
|
28
|
POWER & WATER UTILITY COMPANY FOR JUBAIL & YANBU (MARAFIQ)
|
REPLACEMENT OF ROOF PLATES OF 8 TANKS (HFO/LFO), REPLACE LINEAR HEAT DETECTOR, REPAIR OF STAIRCASE, PAINTING ETC., Contract No.7200004419
|
REHABILITATION OF 8 NOS. LFO&HFO TANKS (24.46 METER DIA. X 15.5 METER HEIGHT) SUCH AS SLUDGE REMOVAL & CLEANING OF TANKS, INSPECTION & NDT WORK, TOTAL REMOVAL & REPLACEMENT OF ROOF PLATE & NOZZLES/MANHOLES, PATCH UP WORK FOR SHELL & BOTTOM PLATES, REPLACE LINEAR HEAT DETECTORS & INSTRUMENT CONDUITS, REPAIR OF PLATFORM & STAIRCASE, REPLACE FOAM PIPE SUPPORT,GRIT BLASTING & PAINTING WORKS.
|
17-05-2008 TO 17-05-2010
|
29
|
POWER & WATER UTILITY COMPANY FOR JUBAIL & YANBU (MARAFIQ)
|
REPAIR OF POTABLE WATER STORAGE TANK, ROOF PLATE REPLACEMENT AND ITS DAMAGED SUPPORTS, COLUMN, PAINTING ETC., Contract No.7200004418
|
REHABILITATION OF POTABLE WATER TANK (60 METER DIA. X 15.50 METER HEIGHT) SUCH AS TOTAL REPLACEMENT OF ROOF PLATES, COLUMNS, GIRDERS & RAFTER, PATCH UP WORKS IN BOTTOM PLATES, REPLACE DAMAGE KNUCKLE PLATES, BLASTING & PAINTING WORKS, INSPECTION & NDT WORKS DISINFECTION, PIPING WORKS, SCAFFOLDING WORKS & ETC.
|
17-05-2008 TO 17-05-2009
|
30
|
POWER & WATER UTILITY COMPANY FOR JUBAIL & YANBU (MARAFIQ)
|
FABRICATION AND INSTALLATION OF ACCESS LADDER Contract No.7200004103
|
FABRICATION & INSTALLATION OF ELEVATED ACCES LADDER & PLATFORMS AT SEAWATER INTAKE CHANNEL, CONCRETE CORING/DRILLING.
|
29-03-2008 TO 29-09-2008
|
31
|
SALINE WATER CONVERSTION CORPORATION, JUBAIL (SWCC)
|
UPGRADE/REPLACEMENT OF LIGHTING FIXTURE IN PH1 AREA Contract No.JB/R/E/165/07
|
UPGRADE/REPLACE OF LIGHTING FIXTURE SYSTEM.
|
16-07-2007 TO 15-07-2008
|
32
|
SALINE WATER CONVERSTION CORPORATION, JEDDAH
|
COMPLETE REHABILITATION OF JEDDAH PLANT PH.4.3 SULFURIC ACID STORAGE TANKS & PAINTING OF THE EXTERNAL WALL ROOF & INTERNAL PAINTING Contract No.JD/R/M/303
|
TANK CLEANING WORK, REPAIR BY PATCH-UP OF BOTTOM PLATES, HYDROTESTING WORK, BLASTING & PAINTING WORK.
|
21-08-2007 TO 20-03-2009
|
33
|
SALINE WATER CONVERSTION CORPORATION, JUBAIL
|
INSTALLATION INCLUDING SUPPLY OF COMPLETE DUCTILE IRON PIPING/FITTINGS FOR THE UNDERGROUND FIREWATER PIPING, CONTRACT NO. Contract No.JB/R/M/336
|
MATERIAL PROCUREMENT, EXCAVATION, CONCRETING OF TRUSS BLOCKS & BACKFILLING WORK, FABRICATION & INSTALLATION OF UNDERGROUND DUCTILE IRON PIPES, TESTING & COMMISSIONING WORK.
|
01-04-2007 TO 30-09-2008
|
34
|
SALINE WATER CONVERSION CORPORATION, YANBU
|
THE RENOVATION AND REPLACING OF POWER HOUSE CORRUGATED SHEETS FROM OUTSIDE & COATING OF THE WALLS, Contract No.YM/R/M/022
|
REPLACING OF CORRUGATED SHEETS & COATING OF THE WALLS
|
19-03-2006 TO 18-03-2007
|
35
|
SALINE WATER CONVERSION CORPORATION, YANBU
|
RENOVATION & REPLACEMENT OF DIESEL LINES, SERVICE LINES, AIR LINES AND CHEMICAL LINES Contract No.YM/R/M/002
|
REPLACEMENT OF DIESEL LINES, SERVICE PIPE LINES, AIR PIPE LINES AND CHEMICAL LINES
|
15-05-2006 TO 14-05-2007
|
36
|
POWER & WATER UTILITY COMPANY FOR JUBAIL & YANBU (MARAFIQ)
|
REPLACEMENT AND RE-ROUTING OF POTABLE WATER, PROCESS WATER AND CHLORINE PIPING AT TANK FARM AREA-YANBU Contract No.MYC-300-394
|
REPLACEMENT AND RE-ROUTING OF POTABLE WATER, PROCESS WATER AND CHLORINE PIPE LINES.
|
NOV.2005 TO MAY 2006
|
37
|
SALINE WATER CONVERSION CORPORATION, KHAFJI
|
REPAIR AND MAINTENANCE OF GANTRAIL SYSTEM SWCC KHAFJI
|
REPAIR & REPLACE OF GUARD RAIL & REPAIR OF RAILS FOUNDATION
|
10MONTHS UPON SITE TURNOVER
|
38
|
AL-KHAFJI JOINT OPERATIONS (ARAMCO)
|
MAINTENANCE OF CRUDE OIL TANKS TK-121, 123 AND ATK-6 Contract No.HT 449 FM 04
|
TANK CLEANING & SLUDGE TREATMENT WORKS. REPAIR BY PATCH-UP OF BOTTOM & FLOATING ROOF PLATES. ROOF DRAIN REPLACEMENT, REPLACE ATK-6 AIR FOAM LINE SYSTEM, FABRICATE & INSTALL NEW SAMPLING SYSTEM, REPAIR OF ROOF LEGS, REPAIR OF FRP COATING, INSTALLATION OF NEW SHELL NOZZLES, REPAIR RING FOUNDATION, BLASTING/ PAINTING
|
12-07-2005 TO 19-12-2007
|
39
|
SALINE WATER CONVERSION CORPORATION, KHAFJI
|
ROOF RE-WATER PROOFING AND LEAK REAPIR WORKS SWCC-KHAFJI
|
RE-WATERPROOFING & LEAK REPAIR WORKS ON THE ROOF OF BUILDING.
|
05-06-2005 TO 05-09-2005
|