1
|
KING FAHAD INDUSTRIAL PORT-JUBAIL
|
REPLACEMENT OF THE UNDERGROUND ASBESTOS WATER CEMENT LINES TO DUCTILE IRON AND PVC PIPING SYSTEM
|
EXCAVATION AND REMOVAL OF EXISTING UNDERGROUND ASBESTOS WATER CEMENT PIPELINES,
DISPOSAL OF ASBESTOS PIPES AND FITTINGS AT DUMPING AREA AS PER PME STANDARD. PROCURMENT AND
INSTALLATION OF NEW DUCTILE IRON PIPES,
UPVC PIPES AND FITTINGS INSTEAD OF PREVIOUS ASBESTOS WATER LINES
|
18 MONTHS
|
2
|
SAUDI ELECTRICITY COMPANY, EASTERN REGION
|
MAINTENANCE OF FUEL STORAGE TANK NO.6 AT TABARJAL POWER PLANT SFC CONTRACT NO.4400008128
|
MOBILIZATION, TANK CLEANING, INSPECTION, REPAIR, BLASTING AND PAINTING FOR INTERNAL AND EXTERNAL OF FUEL STORAGE TANK NO.6
AT TABARJAL POWER PLANT.
|
05 MONTHS
|
3
|
SALINE WATER CONVERSION CORPORATION, KHOBAR
|
REHABILITATION OF TWO (2) HEAVY FUEL STORAGE TANKS LOCATED AT PUMP STATION OF SWCC AL- KHOBAR PLANT.
CONTRACT NO.KH/R/M/327
|
MOBILIZATION, PROCUREMENT OF STEEL PLATE, SLUDGE REMOVAL, TANK CLEANING,REMOVAL
OF EXISTING BOTTOM PLATE, INSTALLATION OF NEW BOTTOM PLATE, INSPECTION, SANDBLASTING, PAINTING, HYDROTEST, EVALUATION OF EXSISTING CP SYSTEM CONDITION.
|
18 MONTHS
|
4
|
SAUDI ELECTRICITY COMPANY, CENTRAL REGION
|
REHABILITATION OF 39 NOS. OF CRUDE OIL STORAGE TANKS AT SEC CENTRAL AREA POWER PLANTS, CONTRACT NO.4400002648
|
MOBILIZATION, TANK CLEANING AND SAFE DISPOSAL OF CRUDE OIL TO SPECIFIED DUMPING AREA, TANK INSPECTION, DO THE NEEDFUL TANK REPAIR WORKS AS PER INSPECTION REPORT,SURFACE PREPARATION, BLASTING, JET CLEANING AND APPLICATION OF
PROTECTIVE COATING MATERIALS.
|
48 MONTHS
|
5
|
SAUDI ELECTRICITY COMPANY, CENTRAL REGION
|
REHABILITATION OF 61 NOS. OF DIESEL FUEL STORAGE TANKS AT SEC CENTRAL AREA POWER PLANTS, CONTRACT NO.4400002647
|
MOBILIZATION, TANK CLEANING AND SAFE DISPOSAL OF DIESEL TO SPECIFIED AREA, TANK INSPECTION, DO THE NEEDFUL TANK REPAIR
WORKS AS PER INSPECTION REPORT,SURFACE PREPARATION, BLASTING, JET CLEANING AND APPLICATION OF PROTECTIVE COATING MATERIALS.
|
48 MONTHS
|